Cyprus Pilot Projects Savvas Vlachos Cyprus Energy Agency 23 January 20 Marseille
WP1-Management and meetings Time plan overview Contribution to all WP 3 rd TMG meeting sc sc sc DEC 13 JAN FEB MAR APR MAY JUN JUL AUG SEP Progress Report OCT- DEC13 Progress Report JAN- MAR Progress Report APR- JUN FLC Certificate OCT- DEC13 FLC Certificate JAN- MAR FLC Certificate APR- JUN 2
WP1-Management and meetings Cert. Amount ( ) Received by the LP Transferred to CEA 1 9,236.50 2 5,494.40 3 6,431.34 4 16,254.48 5 11,247.99 6 13,916.09 7 9,478.72 8 13,344. 9 46,890.58 10 28.165 (pending) 157.915 certified (and approved) 3
WP1-Management and meetings Budget utilization forecast Amount Certified 157,915 Amount entered in Presage and not certified 27,000 Period January 20 - March 20 ( 5,000) Period March 20 - December 20 ( 80,000) Total expenditures (forecast): 410,000 Total spent 184.915 TOTAL CEA BUDGET 517,800 ESTIMATED REALIZATION RATE FOR THE END OF THE PROJECT 80% 4
WP2 information & awareness Communication with WP leader Time plan overview CEA newsletter OCT13 Guidebook Production for the pp owners HOUSEHOLDERS BE YOUR OWN ENERGY MANAGER [SEAI] CEA newsletter FEB PRESS RELEASE FINAL Awareness campaign event (Results and Conclusions) Nov 20 SEP 13 OCT 13 NOV 13 DEC 13 JAN FEB MAR APR MAY JUN 2nd Conference on Power Options for the Eastern Med Region (POEM 2013), 07-08 October 2013, Nicosia, Cyprus Launch call for services Short film production Contract signed for the film production Completion of short film Promote film to media Awareness campaign event (energy stakeholders and media) 5
WP2 information & awareness 6
WP2 information & awareness Pilot Projects filming 1 2 Educational Technical Documentary Innovative technologies Installations and workings Net metering Smart metering Technical Interviews Informative film The Elihmed project The Pilot Projects Beneficiaries Refurbishing workings Interviews (owners, mayors) Contribution of PV companies and Electricity Authority of Cyprus 7
WP2 information & awareness 8
WP2 information & awareness 9
WP4-Integrated strategies Financial Plan The total eligible cost for the pilot activities (energy refurbishment workings) in 25 low income houses in Cyprus is 212.500. The ERDF contribution amounts the 85% of the eligible budget, meaning 180.625 and the remaining 15% should be the national/local and/or own contribution of the Cyprus Energy Agency to the project implementation. The Cyprus Energy Agency aimed to involve other public and private funding during the project implementation. 10
WP4-Financial plan and packages Private Sector Contribute with no charge providing photovltaic installations to the pilot projects Local Authorities Thanks to Electricity Supplier Support the project and cooperate with contribution in kind for the installations of smart meters Energy Regulatory Authority Support the project Approved elihmed to be the pilot for the net metering in Cyprus New National skim anounced fo LIH Contribute with cofinancing and communication support in the framework of local SEAP s Private banks Pursuate private banks for new financial packages New package anounced 13/12/2013 by Hellenic Bank Government Creation of a working team with stakeholders. Financial Package proposal (ENERGY RENOVATIONS) prepared and sent directly to the PRESIDENT OF CYPRUS 17/1/20 11
WP4-Financial plan and packages Financial package Energia for energy renovations by Hellenic Bank For Thermal Insulation Photovoltaics Glazings Solar water heaters Led lighting Maximum amount of loan 10.000 12
WP4-Financial plan and packages Letter proposal for energy renovations to the President of Cyprus 1. The Republic of Cyprus to apply for 100 m from European Investment Bank (to guarantee the 20% of own contribution for a loan for energy renovations by the citizens. These money returns back to the fund after the loan payback. The savings will be used once again for new loans to households) 2. Ensure 30 m from the ERDF (to develop financial packages by private banks, increase awareness and subsidize the interest rates) 3. Ensure 30 m from the European Social Fund (to subsidize energy renovations packages of 10.000 for LIH Signed by: Scientific and Technical Chamber of Cyprus Federation of Associations of Building Contractors Cyprus Cyprus Energy Agency Cyprus Employers and Industrialists Federation Environment Commissioner Council for registration and control of building and civil engineering contractors 13
WP5_Experimentation of Mediterranean-wide solutions for improving energy efficiency Time plan overview (PP PROJECTS) MONITORING AND EVALUATION OF THE WORKINGS DATA COLECTION AND ANALYSIS Refurbishing Workings 6 months duration SEP 13 OCT 13 NOV 13 DEC 13 JAN FEB MAR APR MAY JUN ISSUE THE ENERGY PERFORMANCE CERTIFICATE 13/08/2013 CONTRACT SIGNED Deadline for the completion of the workings according to the contract signed
WP5-Refurbishments progress (page1) Pilot Project Measures Measure description (Contractual obligations) Status 1 (Dhali) Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Waterproof insulation Completed ΙΙΙ Replacement of air conditioning units with new energy efficient Completed 2 (Dhali) Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Waterproof insulation Completed ΙΙΙ Replacement of Solar Water Heating system Completed 3 (Latsia) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Replacement of inefficient lighting with new more efficient - + Waterproof insulation - 4 (Larnaca) Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Waterproof insulation Completed ΙΙΙ Replacement of inefficient lighting with new more efficient Completed ΙV Replacement of Solar Water Heating system Completed 5 (Polis Chrysochous) Ι Installation of new plaster with thermal insulation characteristics and thickness 2,5 cm (walls and beams external) Completed ΙΙ Replacement of inefficient lighting with new more efficient Completed ΙΙΙ Roof thermal insulation with 5cm insulation material Completed 6 (Yeri) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Waterproof insulation - IΙΙ Replacement of Solar Water Heating system - 7 (Lefkara) Ι Installation of new internal ceiling with thermal insulation (thickness 5cm) Completed ΙΙ Installation of new efficient fire place (air module) Completed ΙΙΙ Replacement of inefficient lighting with new more efficient Completed 8 (Lefkara) Ι New efficient fire place and integration with the existing oil boiler for the central heating system of the house Completed ΙΙ Installation of internal thermal insulation (thickness 5cm) above the internal wooden ceiling of the building Completed 15
WP5-Refurbishments progress (page2) Pilot Project Measures Measure description (Contractual obligations) Status 9 (Ayios Ι Roof thermal insulation with 5cm insulation material Completed Athanasios) ΙΙ Waterproof insulation Completed ΙΙΙ Installation of new plaster with thermal insulation characteristics and thickness 2,5 cm (walls and beams external) Completed IV Replacement of single glazing with double glazing with thermal insulated frame Completed 10 (Ayios Ι Roof thermal insulation with 5cm insulation material Completed Athanasios) ΙΙ Replacement of existing (old) hot water tank with new one Completed ΙΙΙ Replacement of inefficient lighting with new more efficient Completed IV Replacement of air conditioning units with new energy efficient Completed 11 (Aradippou) 12 (Aradippou) Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Waterproof insulation Completed ΙΙΙ Replacement of Solar Water Heating system Completed Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Replacement of Solar Water Heating system Completed ΙΙΙ Replacement of inefficient lighting with new more efficient Completed IV Replacement of air conditioning units with new energy efficient Completed 13 (Engomi) Ι Installation of new internal ceiling with thermal insulation (thickness 5cm) Completed ΙΙ Installation of new plaster with thermal insulation characteristics and thickness 2,5 cm (walls and beams external) Completed ΙΙΙ Roof repairs Completed (Strovolos) 15 (Strovolos) 16 (Strovolos) Ι Replacement of Solar Water Heating system - ΙΙ Replacement of inefficient lighting with new more efficient - ΙΙΙ Replacement of air conditioning units with new energy efficient - IV Replacement of single glazing with double glazing with thermal insulated frame - Ι Installation of new internal ceiling with thermal insulation (thickness 5cm) Completed ΙΙ Replacement of inefficient lighting with new more efficient Completed ΙΙΙ Replacement of air conditioning units with new energy efficient Completed IV Installation of new plaster with thermal insulation characteristics and thickness 2,5 cm (walls and beams external) Completed Ι Installation of internal thermal insulation (thickness 5cm) above the internal wooden ceiling of the building Completed ΙΙ Replacement of inefficient lighting with new more efficient - ΙΙΙ Replacement of Solar Water Heating system - ΙV Replacement of air conditioning units with new energy Ταμείο efficient Περιφερειακής (some of Ανάπτυξης them) της ΕΕ - V Replacement of single glazing with double glazing with thermal insulated frame (some of them) - 16
WP5-Refurbishments progress (page3) Pilot Project Measures Measure description (Contractual obligations) Status 17 (Paralimni) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Replacement of single glazing with double glazing with thermal insulated frame (some of them) - ΙΙΙ Replacement of inefficient lighting with new more efficient - 18 (Paralimni) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Installation of new plaster with thermal insulation characteristics and thickness 2,5 cm (walls and beams - external) ΙΙΙ Replacement of inefficient lighting with new more efficient - 19 (Lakatamia) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Modified Waterproof insulation - ΙΙΙ Replacement of inefficient lighting with new more efficient - ΙV Replacement of existing (old) hot water tank with new one - 20 (Lakatamia) Ι Roof thermal insulation with 5cm insulation material Completed ΙΙ Waterproof insulation Completed ΙΙΙ Replacement of inefficient lighting with new more efficient - 21 (Lakatamia) Ι Installation of internal thermal insulation (thickness 5cm) above the internal wooden ceiling of the building - ΙΙ Replacement of inefficient lighting with new more efficient - ΙΙΙ Replacement of single glazing with double glazing with thermal insulated frame (some of them) - 22 (Ergates) Ι Roof thermal insulation with 5cm insulation material - ΙΙ Waterproof insulation - ΙΙΙ Replacement of inefficient lighting with new more efficient - 23 (Psimolofou) Ι Installation of new internal ceiling with thermal insulation (thickness 5cm) - ΙΙ Waterproof insulation - ΙΙΙ Replacement of air conditioning units with new energy efficient - ΙV Replacement of inefficient lighting with new more efficient - 24 (Ayios Athanasios) Ι Installation of new efficient fire place (air module) Completed ΙΙ Replacement of inefficient lighting with new more efficient Completed ΙΙΙ Installation of external blinds Completed 25 (Strovolos) Ι Replacement of existing (old) hot water tank with new one - ΙΙ Installation of new plaster with thermal insulation Project characteristics co-financed by European and thickness Regional 2,5 cm (walls and beams external) Completed 17
WP5-Refurbishments progress (page4) September October November December January February March Contract Duration Phases Phase 1 13/9/13-13/11/13 Progress achieved Progress Report WP5 26 Measures out of 83 completed 4 in progress 34% Phase 2 /11/13-20/1/20 47 Measures out of 83 completed 57% Phase 3 1st 2nd 3rd 18
WP5-Refurbishments progress (page5) PP1 Waterproof insulation and new a/c units PP1 Thermal Insulation and Photovoltaics PP2 - Waterproof insulation PP2 Thermal insulation and new solar thermal water heater 19
WP5-Refurbishments progress (page6) PP4 Thermal Insulation of the roof PP4 Waterproof Insulation and new solar thermal water heater PP7- Efficient lighting and new ceiling with thermal insulation PP7- New efficient fireplace (air module) 20
WP5-Refurbishments progress (page7) PP8 Efficient fireplace (with boiler) installation PP8 Piping workings for the installation of the fireplace PP11 - New solar thermal water heater PP11 Waterproof Insulation 21
WP5-Refurbishments progress (page8) PP12 Thermal Insulation of the roof PP12 New efficient air conditioning compressor PP15 Outdoor after PP15 Ceiling with thermal insulation 22
WP5-Refurbishments progress (page9) PP13 Indoor and outdoor before PP13 Indoor and outdoor after PP16 Thermal Insulation of the roof PP16 - Thermal Insulation of the roof 23
Refurbishments progress (page9) PP20 Roof before insulation PP20 Roof with thermal insulation PP25 Before works PP25 After thermal plaster 24
WP5-Communication with the owners (page1) ON DAILY BASE VIA TELEPHONE VISITS FOR THE SMART METER INSTALLATIONS VISITS FOR THE PHOTOVOLTAICS PHOTOS AND SHORT VIDEOS TO THE PP s VISITS FOR THE EVALUATION OF ELECTRICAL INSTALLATIONS VISITS FOR THE COLLECTION OF DATA VISITS FOR RETROFIT UPDATE AND PROGRAMING SURVEY 25
WP5-Communication with the owners (page2) Bilateral meetings with owners TARGETING TO CHANGE ENERGY BEHAVIOUR 09/10/2013 PP16 22/10/2013 PP15 8/11/2013 PP13 13/11/2013 PP8 13/11/2013 PP7 13/11/2013 PP20 13/11/2013 PP25 26/11/2013 PP3 20/01/20 PP24 26
WP5 - Refurbishments evaluation First impressions TELEPHONE SURVEY A Winter 2013-20 SURVEY B Summer 20 SURVEY C Winter 20 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CHANGE OF BEHAVIOUR TRAINING THE OWNERS EVALUATION OF OWNERS ENERGY BEHAVIOUR 27
WP5 - Refurbishments evaluation First impressions TELEPHONE SURVEY A Winter 2013-20 SURVEY B Summer 20 SURVEY C Winter 20 First impressions What they did like? What they did not like? Refurbishments quality Level of satisfaction How the refurbishments affect the indoor conditions Complains etc CHANGE OF BEHAVIOUR TRAINING THE OWNERS Energy saving tips Guidelines Basic training Monitoring tools Educational material Impressions (completion of winter period) What they did like? What they did not like? Refurbishments quality Level of satisfaction How the refurbishments affect the indoor conditions Communication with CEA Communication with the contractor Complains etc Savings Changes to the energy bills Impressions (completion of summer period) What they did like? What they did not like? Level of satisfaction How the refurbishments affect the indoor conditions Savings Changes to the energy bills Impressions (completion of a year) What they did like? What they did not like? Level of satisfaction How the refurbishments affect the indoor conditions Savings Changes to the energy bills Evaluation of the refurbishments Changes to the behaviour Thoughts for future improvements 28
WP5-First evaluation (page1) PP Owner Level of satisfactions Comments Level of cooperation 1 Despoina Theodosiou 2 Varnavas Georgiou 4 Kyriaki Themistokleous 5 Persefoni Charalambous No answer Satisfied with the roof insulation and the solar water heater but he was expecting more workings from the project. Very satisfied with the roof insulation. As a result they use less the heating system. Very happy with the production of electricity from the PV s Satisfied with the refurbishment. Very good Good Average Poor X Very good Good Average Poor X Very good Good Average Poor X Very good Good Average Poor X 7 Nikos Kortaris Very satisfied with the roof insulation and the new energy efficient fireplace (air module) 8 Andreas Stavrinou Very satisfied with the roof insulation and the new energy efficient fireplace (Boiler). They are very enthusiastic with the output of the fireplace. They stopped using oil for the central heating 11 Andreas Mina Satisfied with the roof insulation and the solar water heater. Very good Good Average Poor X Very good Good Average Poor X Very good Good Average Poor X 29
WP5-First evaluation (page2) PP Owner Level of satisfactions Comments Level of cooperation 12 Yiannoula Hatzitoouli Very satisfied with the roof insulation, the efficiency of the new air conditioning units and the solar water heater. Very good Good Average Poor X 13 Eftychia Dimitriou 15 Evagoras Dionysiou They are satisfied with the refurbishment (thermal insulation walls and roofs) but they still feel the house cold. Note: They do not use efficient heating devices Very Satisfied with the refurbishment. The indoor conditions improved very much. Very good Good Average Poor X Very good Good Average Poor X 16 Katerina Hristofi Satisfied with the roof insulation. The indoor conditions improved. Very good Good Average Poor X 20 Myrianthi Menelaou Satisfied with the roof insulation and the electricity production from the PV s. Very good Good Average Poor X 24 Martha Achilleos Very satisfied with the new energy efficient wood stove. Very efficient to heat the whole area of the apartment. Very good Good Average Poor X 25 Panayiotis Pantazis Average satisfaction with the effect of the wall insulation. He was expecting greater improvement. Very good Good Average Poor X 30
WP6_Intelligent energy management systems Time plan overview (NET METERING) MONITORING AND EVALUATION OF ELECTRICITY DATA COLLECTED INSTALLATION OF SMART METERS JAN 2013...FEB 20 (2 REMAINING) INSTALLATION OF PV s NET METETERING JAN 2013...FEB 20 (2 REMAINING) Indoor smart meter installed (pp3) 26/11/13 Indoor smart meter installed (pp24) 4/12/13 SEP 13 OCT 13 NOV 13 DEC 13 JAN FEB MAR APR MAY JUN ADDITIONAL 2 INDOOR SMART METERS PURCHASED FOR 2 SELECTED PP. DETAILED ANALYSIS TEMPERATURE AND HUMIDITY DATA LOGGERS INSTALLED INDOOR FOR 2 SELECTED PP CLIMATILOGIGAL DATA COLLECTED FOR 2010-2013 DETAILED CLIMATILOGIGAL DATA (ON DAILY BASIS) COLLECTED FOR 2010-2013 31
Wp6-Progress achieved (page1) PP Owner Smart Meter Indoor Smart Meter PV En. Renovation 1 Despoina Theodosiou Yes - Installed Completed 2 Varnavas Souroupi Yes - - Completed 3 Christina Kakouli Yes Yes Installed 4 Kyriaki Themistokleous Yes - Installed Completed 5 Persefoni Charalambous Pending - Pending Completed 6 Maria Chatzianastasi Pending - Pending 7 Nicos Kortaris Pending - - Completed 8 Andreas Stavrinou Yes - - Completed 9 Androula Charalambous Yes - Installed Completed 10 Aggela Yialouridou Yes - Installed Completed 11 Andreas Mina Yes - - Completed 12 Yiannoula Hatzittoouli Pending - - Completed 13 Eftychia Dimitriou Yes - - Completed Christina Andreou Yes - - 15 Evagoras Dionysiou Yes - - Completed 16 Katerina Christofi Yes - - 50% 17 Fotoula Krasa Yes - - 18 Marikkou Sofokli Yes - Installed 19 Christoula Aristeidou Yes - - 20 Myrianthi Menelaou Yes - Installed Completed 21 Ioannis Ioannides Yes - - 22 Eleni Hatzicosta Yes - Installed Completed 23 Christina Ioannou Yes - Installed 24 Martha Achileos Yes Yes - Completed 25 Panayiotis Pantazis Yes - - Completed 32
Wp6-Progress achieved (page2) 21 smart meters installed 2 additional indoor smart meters installed 9 photovoltaic installations completed Meteorological data collected Energy data (from smart meters) collected MONITORING AND EVALUATION OF ELECTRICITY DATA COLLECTED 33
34
WP6-Net metering 4.5 20/8/2013 4 3.5 3 kwh 2.5 2 1.5 Import Export PV Gneration 1 0.5 0 00:00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 12:00:00 13:00:00 :00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 35
Wp6-Progress achieved (page3) Outdoor smart metering units The purchase and the Installations of the smart meters are 100% contribution in kind by the Electricity Authority of Cyprus (Estimated cost 30.000). 36
Wp6-Progress achieved (page4) Indoor smart metering units In addition, 2 temperature and air humidity data loggers installed to 2 pilot dwellings for deeper analysis of the indoor conditions after the energy renovations. Furthermore, 2 more devices have been installed to the above 2 dwellings in order to register electricity consumption per device for further and more detailed analysis of the electricity consumption (lighting, cooker, air condition etc.). The 2 dwellings were selected according to the suitability and the age of the buildings electrical power board (separation of cabling in zones). 37
WP6-Designing indoor units In-house smart metering device: Yianitza UMG 604 and 2 * UMG104 for each of the 2 dwellings. For the purpose of the project, a smart metering device (box) developed containing 3 metering devices (1 Yianitza UMG604 and 2 UMG104 and wireless access point). The reason is to have the capacity of recording and monitoring the detailed electricity consumption of the households per use (cooker, lighting, electrical appliances etc.) 38
WP6-Installing indoor units 39
WP6-Installing indoor units 40
WP6-Installing indoor units IN HOUSE Owners tablet Access via the web browser Smart metering devices Ethernet connection WiFi access point House s router CEA PREMISES GRIDVIS SOFTWARE 41
WP6-Monitoring Software GridVis 42
WP6-Monitoring Software Cooker Lighting Electrical Appliances Fridge Air conditioning Hot water boiler Washing machine Active Power Reactive Power Current Voltage Power factor Energy Consumption REAL TIME DATA Storing historical values 43
WP6- outdoor meteorological data Temperature Relative humidity Athalassa Athalassa 40.0 50 35.0 45 30.0 40 35 25.0 30 20.0 25 15.0 10.0 20 15 10 5.0 5 0.0 2010 2011 2012 2013 0 January February March April May June July August September October November December 2010 2011 2012 2013 44