FEEDER UNIT PROTECTION ILSAS 27sep-8oct 2004 Subra@prot_kl 1
OBJEKTIF Para hadirin dapat mentakrifkan prinsip asas Arus Mengeliling dan kegunaannya dalam Perlindungan Pilot Wire jenis Solkor-RF tanpa sebarang kesilapan. 2
PRINSIP ASAS ARUS MENGELILING I in =500A Power Cable/OH Line I out =500A CT 1000/1A CT 1000/1A Station A Ia Ib Station B Geganti Diff. R I diff =Ia - Ib Dawai Pandu +++ALATUBAH ARUS (CT) MESTI SAMA DI KEDUA HUJUNG+++ 3
KEROSAKAN DI LUAR ZONE Institut Latihan Sultan Ahmad Shah Station B I in =5000A CT 1000/1A I out=5000a CT 1000/1A Station A Ia 5A 5A Diff Relay R 5A I diff =Ia - Ib = 0.0A Ib 5A If=5000A Kerosakan Busbar 5A 5A Iin = Iout = 5000A; I fault=5000a Arus Geganti, Idiff = Ia -Ib = 5A-5A=0.0A Kerosakan Luar Zone, Geganti Tidak Kendali 4
I in=5500amp KEROSAKAN DALAMAN Institut Latihan Sultan Ahmad Shah CT 1000/1A I out=500a Station A CT 1000/1A Ia 5.5A 5000 Amp 0.5A Ib Station B 5.5A Ia R Ib I diff =Ia -Ib = 5 A 0.5A 5.5A 0.5A I in = 5500A ; I out = 500A ; Ifault=5000A Maka, I in I out Ia = 5.5A ; Ib = 0.5A ; Ia Ib Arus Geganti, Idiff= Ia-Ib= 5.0A Kerosakan Dlm Zone, Geganti Kendali/Trip 5
TJPS 11KV I in = 100A Perlindungan Pilot Wire Yang Praktikal Institut Latihan Sultan Ahmad Shah I out = 100A ESSO 11KV 11KV power cable CT 300/5A CT 300/5A Tx Pilot Cable Rx e / l Rx Tx l / e Solkor-Rf @ TJPS Solkor-Rf @ ESSO Tidak praktikal utk memasang satu geganti di tengah perjalanan kabel pandu. Dua geganti diperlukan utk melengkapi perlindungan Pilot Wire. 6
Pilot Wire Protection Solkor-Rf Solkor_Rf Summation Transformer Relay connection 7
Padding Resistor-Rpp Rintangan Dawai Pandu berkadaran dgn panjang kabel pandu. Utk memastiakn kendalian geganti sentiasa sama perintang Rpp perlu ditatah pd setiap geganti. 2(Rpp) + Rpilot = 2000 Ω Jika Rpilot= 500 Ω; 2(Rpp)= (2000-500)=1500 Ω Rpp setiap geganti ditatah pada 1500 Ω 2 = 750 Ω 8
Penggunaan Solkor-Rf Dengan Summation Transformer hanya satu unit geganti diperlukan disetiap hujung pembekal. Kepekaan geganti bergantung pada jenis kerusakan (R-E..,B-R) Bagi perlindungan pembekal 33kV&11kV hanya 2 unit geganti diperlukan. Perlindungan Penghantaran perlu 6 unit Solkor-Rf bagi satu pempekal, 2 unit per fasa 9
I in =500A Litar Buka Dawai Pandu CT 1000/1A I load =500A CT 1000/1A I out =500A Station A 0.5A 0.5A Ia 0A Ib I diff =Ia - Ib 0.5A R = 0.5A R 0.5A Station B 0A 0A I diff =Ia - Ib = 0.5A Litar buka dawai pandu Geganti Solkor-Rf salah kendali di kedua hujung 10
Pilot Supervision and Guard Relay Geganti Penyeliaan Dan Pengawal Dawai Pandu Supervision Guard 11
Litar Buka Dawai Pandu Geganti Pilot Supervision Akan mengendaliakn Alarm bila dawai pandu litar buka atau pintas. Pelantikan tidak dapat dielakkan oleh geganti Pilot Supervision. Guard Relay Utk mengelakkan pelantikan berpunca dari dawai pandu berlitar buka. 12
I in=????amp KEROSAKAN DLM ZONE Institut Latihan Sultan Ahmad Shah CT???? I out=500a Station A Ia CT 1000/1A 4000 Amp Ib Station B R I diff =??? I out = 500A ; I fault=4000a; KIRA: CT Ratio di Sub B=??, I in =??? ; Ia =? Ib =? Relay current, Idiff =? > Geganti ini Trip atau tidak? 13
Soalan 2 Bagaimana masalah pelantikan geganti Solkor-RF disebabkan kerosakan dawai pandu dapat diatasi? a). b). 14
Thank You 15